The mounting propacet PM

The mounting propacet PM

№ 6454391, posted 7 months ago


Place trades

Kazakhstan

Описание

The mounting propacet PM
Always in stock a large amount of pinapakita mounting for the insulation of joints of pipes PPU. Propagate mounting are supplied the respective volume for each diameter of pipes in foam insulation. The number of components A and B corresponds exactly to that required for obtaining the polyurethane foam layer with the calculated thickness in accordance with GOST 30732-2006. Dosing accuracy ± 1% of the total components. The start components (start of the reaction the foaming since the mixing) is 60 seconds, which gives the opportunity to spend carefully all the contents of the package. Propacet installation should be stored at temperatures between +5 to +25 °C in a dry place, to eliminate mechanical stress. Before applying propacet should be checked for external integrity, then you need to stand it for more than 12 hours at a temperature of 15-20 degrees Celsius.
Propacet mounting, the mounting propacet PM, propacet PM, propacet for insulation, foam insulation, insulation joints, insulation polyurethane pipes, polyurethane components, polyurethane components Izolan